Monday, 17 February 2014

When BA means B∪ll$#!t Artist

BA  means Business Analyst, but what makes for a good BA?  When do you have a good BA and when do you have someone who isn't? Many projects fail at the beginning due to incomplete, inconsistent, and overly verbose analysis that then leads to incorrect project plans and projects heading in the wrong direction.

Business analysis consists of all facets of solving business problems. Business analysis is a role executed by project, product, and engineering managers as well as other people.  However, there are people that do business analysis as their main role and we simply label them as business analysts or product managers.

We shall stick to the term business analyst for simplicity. Business analysts perform a range of tasks including:
  • Gathering requirements
  • Writing business cases and project charters
  • Performing gap analyses to incorporate new products
Are your BAs any good?  

The success of many projects depend on the ability of the BA do correctly identify the problem you are trying to solve.  If your BA is not competent then you are doomed before you start.

Ever suspect that the people responsible for performing business analysis for you are not up for the challenge?  Here are three simple questions; good business analysts will get all three correct and not take longer than 30 seconds.

Context Question
#1 Which of these two lines is longer?
#2 What does this sign say?
#3 I have two products whose prices add up to $1.10 and one product is $1 more than the other. How much is the more expensive product?

The answers are:
  1. The lines are the same length
    • Take a ruler if you are not convinced
  2. Paris in the the spring
    • Notice that the occurs twice
  3. The more expensive product is $1.05
    • If the more expensive one had been $1 then the cheaper one would be $0.10 but then the expensive one would only be $0.90 more expensive than the cheaper one.
These three questions illustrate that the mind can jump to conclusions that are often wrong. The mind can be tricked because it assesses things quickly, i.e. jumps to conclusions.  Only some people have the instinct to double check their results and check for personal bias.

Most BAs are well educated; however, the interesting thing is that studies show that educated people are less able to see their biases and they jump to conclusions more readily than other people.1 Even worse, well educated people have less of a tendency to check their conclusions than other people.

A good business analyst realizes that during analysis there will be situations where the mind will jump to conclusions.  Many business analysts are asked to resolve conflicting requirements, recognize missing requirements, and deal with biases coming from many different sources.  Unless you have the reflex of checking facts for consistency and eliminating bias then you won't make a good business analyst.

So what is the quality of your BAs?

Other articles

Bibliography

1 West, Richard F. and Meserve, Russel J. Cognitive Sophistication does not Attenuate the Bias Blind Spot. Journal of Personality and Social Psychology.

Thursday, 16 January 2014

No Business Case == Project Failure

A business case comes between a bright idea for a software project and the creation of the software project. 

  • To - idea to have a project is born
  • Tcheck - formal or informal business case
  • Tstart - project is initiated
  • Tend - project finishes successfully or is abandoned
Not all ideas for software projects make sense.  In the yellow zone above, between idea and project being initiated, some due diligence on the project idea should occur.  This is where you do the business case, even if only informally on the back of a napkin.

The business case is where you pause and and estimate  whether the project is worth it, i.e. will this project leave you better off than if you did not do it. For those who want precise definitions the project should be NPV +ve.  In layman's terms, the project should leave the organization better off on it's bottom line or at least improve skill levels so that other projects are better off.

Projects that do not improve skills or the bottom line are a failure.

Out of 10 software projects (see Understanding your chances):
  • 3 are successful
  • 4 are challenged, i.e. over cost, over budget, or deliver much less functionality
  • 3 will fail, i.e. abandoned
This means that the base rate of success for any software project is only 3 out of 10. Yet executives routinely execute projects assuming that they can not fail, even though the project team may know that the project will be a failure from day 1.

Business cases give executives a chance to stop dubious projects before they start. (see Stupid is as Stupid Does) Understanding how formal the business case needs to be comes down to uncertainty. There are three key uncertainties with every project:
  • Requirements uncertainty
  • Technical uncertainty
  • Skills uncertainty
When there is a moderate amount of uncertainty in any of these three areas then a formal business case with cash flows and risks needs to be prepared.

Requirements Uncertainty

Requirements uncertainty is what leads to scope shift (scope creep).

The probability of a project failing is proportional to the number of unknown requirements when the project starts (see Shift Happens).

Requirements uncertainty is only low for two particular projects:
  1. re-engineering a project where the requirements do not change
  2. the next minor version of a software project. 
For all other software projects the requirements uncertainty is moderate and a formal business case should be prepared.

Projects new to you have high requirements uncertainty.

Technical Uncertainty

Technical uncertainty exists when it is not clear that all requirements can be implemented using the selected technologies at the level of performance required for the project. Technical uncertainty is only low when you have a strong understanding of the requirements and the implementation technology.  Uncertainty and risk are two different animals (see  Uncertainty Trumps Risk in Software Development)

When there is only a moderate understanding of the requirements or the implementation technology then you will encounter the following problems:
  • Requirements that get clarified late in the project that the implementation technology will not support
  • Requirements that can not be implemented once you improve your understanding of the implementation technology
Therefore technical uncertainty is high when you are doing a project for the first time and requirement uncertainty is high.  Technical uncertainty is high when you are using new technologies, i.e. shifting from Java to .NET or changing GUI technology.

Projects with new technologies have moderate to high uncertainty.

Skills Uncertainty

Skills uncertainty comes from using resources that are unfamiliar with the requirements or the implementation technology.  Skills uncertainty is a knowledge problem.

Skills uncertainty is only low when the resources understand the current requirements and implementation technology.

Resources unfamiliar with the requirements will often implement requirements in a suboptimal way when requirements are not well written.  This will involve rework; the worse the requirements are understood the more rework will be necessary.

Resources unfamiliar with the implementation technology will make mistakes choosing implementation methods due to lack of familiarity with the philosophies of the implementation libraries.  Often after a project is complete, resources will understood that different implementation tactics should have been used.

Formal or Informal Business Cases?

An informal business case is possible only if the requirements, technical, and skills uncertainty is low.  This only happens in a few situations:
  • Replacing a system where the requirements will be the same and the implementation technology is well understood by the team
  • The next minor version of a software system
Every other project requires a formal business case that will quantify what kind of uncertainty and what degree of uncertainty exists in the project.  At a minimum project managers facing moderate to high uncertainty should be motivated to push for a business case (see Stupid is as Stupid Does).

Here is a list of projects that tend to be accepted without any kind of real business case that quantifies the uncertainties:
  • Change of implementation technology
    • Moving to object-oriented technology if you don't use it
    • Moving from .NET to Java or vice versa
  • Software projects by non-software companies
  • Using generalists to implement technical solutions
  • Replacing systems with resources unfamiliar with the requirements
    • Often happens with outsourcing
Projects with moderate to high risks and no business case are doomed to fail.

Related articles

  • No Experience Necessary!
    • Surprisingly there is no correlation between years of experience and productivity.  This has been verified over 40 years.
  • Stop it! No, Really Stop It!
    • 5 worst practices that software organizations commonly practice that they need to stop right away

Tuesday, 3 December 2013

What the Heck are Non-Functional Requirements?

If functional requirements are for the end-users (customers), then who are the non-functional requirements for?

Non-functional requirements are for those that install and maintain operational code, i.e. the help desk and operators

Every developer needs to be aware of what those non-functional requirements are and why operations personnel and help desk personnel are indirect  customers that are really  important.  There is no way for these guys to be unhappy and it not to back up into development as an urgent problem!

Functional Requirements

Functional requirements are baked into the code that developer's deliver (interpreted or compiled).   Events from input devices (network, keyboard, devices) trigger functions to convert input into output -- all functions have the form:


This is true whether you use an object-oriented language or not.

Non-functional requirements involve everything that surrounds a functional code unit.  Non-functional requirements concern things that involve time, memory, access, and location:

Performance
  • Server must be able to handle 100 transactions a second
  • End user must have less than 1 second response
Availability
  • The service has to be available 99.99% of the time during the service hours
Capacity
  • During service hours the server must support 700 simultaneous users
Continuity
  • Service is resilient to disk, machine, and operational center failure
Security
  • Ensure that only people authorized to access the service can
  • Ensure that data is never corrupted due to illegal activity or machine failure

I won't spend any time on performance because this is the non-functional requirement that everyone understands.

Non-functional requirements are slightly different between desktop applications and services; this article is focused on non-functional requirements for services.

If you have any knowledge of ITIL you will recognize that the highlighted items deal with the warranty of a service.  In fact, the functional requirements involve the utility of a service, the non-functional requirements involve the warranty of a service.

Availability

Availability is about making sure that a service is available when it is supposed to be available. Availability is about a Configuration Item (CI) in the environment of the operations center that specifies how the code is accessed.  Availability is decided independently of the code and is at best part of the Service Design Package (SDP) that is delivered to the operations department.

Developer's need to be aware of single-points of failure (i.e. services hard-coded to a specific IP) which causes fits in operations that are not running virtual machines (VM) that can have virtual IPs . The requirement to create code that is not reliant on static IPs or specific machines is a non-functional requirement.  Availability is simplified in operations if the code is resilient enough to allow itself to easily move (or be replicated) among servers.

Availability non-functional requirements include:
  • Code to verify that customers are in their user windows
  • Automatic installation of CI or mechanisms
  • Ability to detect and prevent manual errors for a CI
  • Ability to easily move code between servers

Capacity

Capacity is about delivering enough functionality when required.  If you ask a web service to supply 1,000 requests a second when that server is only capable of 100 requests a second then something will fail.

This may look like an availability issue, but it is caused because you can't handle the capacity requested.

Internet services can't provide enough capacity with a single machine and operations personnel need to be able to run multiple servers with the same software to meet capacity requirements.  The ability to run multiple servers without conflicts is a non-functional requirement. The ability to take a failing node and restart it on another machine or VM is a non-functional requirement.

Capacity non-functional requirements include:
  • Ability to run multiple instances of code easily
  • Ability to easily move a running code instance to another server

Continuity

Continuity involves being able to be robust against major interruptions to a service, these include power outages, floods or fires in an operational center, or any other disaster that can disrupt the network or physical machines.

Where availability and capacity often involve redundancy inside a single operation center, continuity involves geographic and network redundancy.  Continuity at best involves having multiple servers that can work in geographically distributed operation centers.  At worst, you need to be able to have a master-slave fail over model with the ability to journal transactions and eventually bring the master back up.

Continuity non-functional requirements include:
  • Resilience of a code base to potential network outages, i.e. ability to retry transactions or find a new server
  • Making sure that correct error messages are returned when physical failures are encountered, i.e. if the network is unavailable then don't give the end-user a message "Customer record has errors, please correct".
  • Ability to recognize inconsistent data and not continue to corrupt data inside the database.


Security
Security non-functional requirements concern who has access to functions and preventing the integrity of data from being corrupted.

Where access is concerned, how difficult will it be for operations personnel or help desks to set up security for users?

Developer's build in different levels of access into their applications without considering how difficult it will be for a 3rd party (help desk or operations) to set-up end users.

Data integrity is another non-functional requirement.  Developer's need to consider how their applications will behave if the program encounters corrupted data due to machine or network failures.  This is not as important an issue in environments using RAID or redundant databases.

Security non-functional requirements include:
  • Ease of a help desk to set up a new user on an application
  • Ability to configure a user's rights to enable them only to access the functions that they have a right to
  • Ensuring through data redundancy or consistency algorithms that data is not corrupted


When You Forget Non-Functional Requirements...

Commonly start-ups are so busy setting up their services that the put non-functional requirements on the back burner.  The problem is that there are non-functional requirements that need to be designed into the architecture when software is created.

For example, it is easy to be fooled into building software that is tied to a single machine, however, this will not scale in operations and cause problems later on.  One of the start-ups I was with built a server for processing credit/debit card transactions without considering non-functional requirements (capacity, continuity).

 It cost more to add the non-functional requirements than it cost to develop the software!

Every non-functional requirement that is not thought through at the inception of a project will often represent significant work to add later on.  Every such project is a 0 function point project that will require non zero cost!

Generally availability, capacity, and continuity is not a problem for services developed with cloud computing in mind.  However, there are thousands of legacy services that were developed before cloud computing was even possible.

If you are developing a new service then make sure it is cloud enabled!

Operations People are People Too

Make no mistake, operations and help desk personnel are fairly resourceful and have learned how to manage software where non-functional requirements are not addressed by the developers.

Hardware and OS solutions exist for making up for poorly written software that assumes single machines or does not take into account the environment that the code is running in, but that can come at a fairly steep cost in infrastructure.

The world has moved to services and it is no longer possible for developers to ignore the non-functional requirements involved with the code that they are developing.  Developer's that think through the non-functional requirements can reduce costs dramatically on the bottom line and quality of service being delivered.

The guys that run  operational centers and help desks are customers that are only slightly less important than the end-user.  Early consideration of the non-functional requirements makes their lives easier and makes it much easier to sell your software/services. It is no longer possible for competent developers to be unaware of non-functional requirements.



Other Articles
No Experience Necessary Counter-intuitive evidence why years of experience does not make developers more productive
Shift Happens Why scope shift on development projects is inevitable and why not capturing requirements at the start of a project can doom it to failure.
Inspections are not Optional Software inspections are intensive but evidence shows that for each hour of inspection you can reduce QA by 4 hours!

Tuesday, 19 November 2013

Who should set defect priority?

Surprisingly, defect priority should not be set by QA.  QA are generally the owners of the defect tracking system and control it, but this is one attribute that they should not control.  The defect tracker is a shared resource between QA, engineering, engineering management, and product mangement and is a coordinating mechanism for all these parties.

Commonly people mix up priority and severity, for example, there may be a severe defect that causes the software either not to install or to cease functioning.

It is common for new releases to have various installation problems when they first get to QA. This blocks QA, so they mark the defects with a high severity and high priority.  This issue has a high severity and needs to be addressed right away, but remember bug tracking systems are append only -- once this defect gets into the system, it will never get out.  This kind of issue should be escalated to the engineers and engineering management because it makes little sense to clog the defect tracking system with it.

Now there may be intermittent issues that cause the software to fail and you may assume that this defect would be high priority, but if it occurs very rarely and would cost too much to fix then this defect may be a low priority.  Once again the priority of an intermittent severe issue can not be determined by QA.

Similarly, there may be many cosmetic or minor defects where fixing them might make a huge difference in the user experience and reduce support calls.  Even though these defects are minor, they may be easy to fix and save you serious money.  Once again, this can not be decided by QA.

Therefore, QA should reserve the right to set the initial severity, and may have an internal field for QA priority, but the priority of a defect should be determined by a product manager (PM) who has a more complete understanding of the overall context of the product.  The priority of a defect is a business issue, not an engineering or QA issue.

Ideally, the product manger will set the priority of a defect during a defect triage session where representatives from engineering, engineering management, and QA are present. As you go through each new defect each person can present their logic for what the priority should be.  The PM should then set the priority defect and assign the release it should be fixed in (i.e. this release, minor release, major release, won't fix).  Ideally there are extra fields in the defect record for both QA and development to put their priority beliefs.

It is important that the main status field of a defect not include any of the following or your defect tracker will go to hell (i.e. this information should be in other fields):
  • Priority
  • Severity
  • Fix version
It is very hard to generate meaningful reports when these attributes creep into the defect status.  This has happened if you have a multi-page training manual for entering defects into the system.  Some of the statuses that make sense initially but turn the defect system into a nightmare are:
  • FAD (functions as designed)
  • WontFix
  • NextVersion
  • CantReproduce
Of course, if you don't have regular bug triage sessions with all the parties mentioned above then you are probably sand-bagged in fire-fighting.